expanded iterator statuscodes and added inert project code
This commit is contained in:
parent
70b81d751b
commit
0a3b9d9d47
120
conf.org
120
conf.org
|
@ -2165,7 +2165,7 @@ These are functions and variables exclusively for agenda block manipulation with
|
|||
(defconst nd/inert-delay-days 90
|
||||
"The number of days to wait before tasks are considered inert.")
|
||||
|
||||
(defconst nd/iter-statuscodes '(:uninit :empty :active)
|
||||
(defconst nd/iter-statuscodes '(:uninit :unscheduled :empty :project-error :active)
|
||||
"Iterators can have these statuscodes.")
|
||||
|
||||
(defconst nd/peri-future-time nd/iter-future-time
|
||||
|
@ -2421,7 +2421,8 @@ Projects are tested according to their statuscodes, which in turn are a function
|
|||
"Compare position of statuscodes SC1 and SC2 in SC-LIST using operator OP."
|
||||
`(,op (position ,sc1 ,sc-list) (position ,sc2 ,sc-list)))
|
||||
|
||||
(defun nd/descend-into-project (allowed-statuscodes trans-tbl get-task-status)
|
||||
(defun nd/descend-into-project
|
||||
(allowed-statuscodes trans-tbl get-task-status callback-fun)
|
||||
"Loop through (sub)project and return overall statuscode.
|
||||
|
||||
The returned statuscode is chosen from list ALLOWED-STATUSCODES where
|
||||
|
@ -2441,7 +2442,7 @@ obtain a statuscode-equivalent of the status of the tasks."
|
|||
;; when this is encountered the loop is broken because we are done
|
||||
;; (the last entry trumps all others)
|
||||
(let ((project-status (first allowed-statuscodes))
|
||||
(breaker-status (car (last allowed-statuscodes)))
|
||||
(breaker-status (-last-item allowed-statuscodes))
|
||||
(previous-point))
|
||||
(save-excursion
|
||||
(setq previous-point (point))
|
||||
|
@ -2454,7 +2455,7 @@ obtain a statuscode-equivalent of the status of the tasks."
|
|||
(let ((new-status
|
||||
;; if project then descend recursively
|
||||
(if (nd/heading-has-children 'nd/is-todoitem-p)
|
||||
(let ((n (nd/get-project-status)))
|
||||
(let ((n (funcall callback-fun)))
|
||||
;; if project returns an allowed status
|
||||
;; then use that
|
||||
(or (and (member n allowed-statuscodes) n)
|
||||
|
@ -2485,7 +2486,8 @@ obtain a statuscode-equivalent of the status of the tasks."
|
|||
((nd/is-scheduled-heading-p) :scheduled-project)
|
||||
|
||||
;; held projects do not care what is underneath them
|
||||
((equal keyword "HOLD") :held)
|
||||
;; only need to test if they are inert
|
||||
((equal keyword "HOLD") (if (nd/is-inert-p) :inert :held))
|
||||
|
||||
;; projects with invalid todostates are nonsense
|
||||
((member keyword nd/project-invalid-todostates)
|
||||
|
@ -2501,6 +2503,7 @@ obtain a statuscode-equivalent of the status of the tasks."
|
|||
(nd/descend-into-project
|
||||
'(:archivable :complete)
|
||||
'((:stuck . 1)
|
||||
(:inert . 1)
|
||||
(:held . 1)
|
||||
(:waiting . 1)
|
||||
(:active . 1)
|
||||
|
@ -2510,13 +2513,15 @@ obtain a statuscode-equivalent of the status of the tasks."
|
|||
(:done-incomplete . 1))
|
||||
(lambda (k)
|
||||
(if (and (member k org-done-keywords)
|
||||
(nd/is-archivable-heading-p)) 0 1))))
|
||||
(nd/is-archivable-heading-p)) 0 1))
|
||||
#'nd/get-project-status))
|
||||
|
||||
;; done projects are like canceled projects but can also be incomplete
|
||||
((equal keyword "DONE")
|
||||
(nd/descend-into-project
|
||||
'(:archivable :complete :done-incomplete)
|
||||
'((:stuck . 2)
|
||||
(:inert . 2)
|
||||
(:held . 2)
|
||||
(:waiting . 2)
|
||||
(:active . 2)
|
||||
|
@ -2526,55 +2531,104 @@ obtain a statuscode-equivalent of the status of the tasks."
|
|||
(lambda (k)
|
||||
(if (member k org-done-keywords)
|
||||
(if (nd/is-archivable-heading-p) 0 1)
|
||||
2))))
|
||||
2))
|
||||
#'nd/get-project-status))
|
||||
|
||||
;; project with TODO states could be basically any status
|
||||
((equal keyword "TODO")
|
||||
(nd/descend-into-project
|
||||
'(:undone-complete :stuck :held :waiting :active)
|
||||
'(:undone-complete :stuck :held :waiting :active :inert)
|
||||
'((:complete . 0)
|
||||
(:archivable . 0)
|
||||
(:scheduled-project . 1)
|
||||
(:invalid-todostate . 1)
|
||||
(:done-incomplete . 1))
|
||||
(lambda (k)
|
||||
(cond ((equal k "TODO") (if (nd/is-scheduled-heading-p) 4 1))
|
||||
(cond ((nd/is-inert-p) 5)
|
||||
((equal k "TODO") (if (nd/is-scheduled-heading-p) 4 1))
|
||||
((equal k "HOLD") 2)
|
||||
((equal k "WAIT") 3)
|
||||
((equal k "NEXT") 4)
|
||||
(t 0)))))
|
||||
(t 0)))
|
||||
#'nd/get-project-status))
|
||||
|
||||
(t (error (concat "invalid keyword detected: " keyword))))))
|
||||
#+END_SRC
|
||||
****** repeater testing
|
||||
Iterators and periodicals are tested similarly to projects in that they have statuscodes.
|
||||
#+BEGIN_SRC emacs-lisp
|
||||
(defun nd/get-iterator-project-status (kw)
|
||||
(cond
|
||||
((or (nd/is-scheduled-heading-p)
|
||||
(member kw nd/project-invalid-todostates) :project-error))
|
||||
|
||||
;; canceled tasks add nothing
|
||||
((equal kw "CANC") :empty)
|
||||
|
||||
;;
|
||||
;; these require descending into the project subtasks
|
||||
;;
|
||||
|
||||
;; done projects either add nothing (empty) or are not actually
|
||||
;; done (project error)
|
||||
((equal kw "DONE")
|
||||
(nd/descend-into-project
|
||||
'(:empty :project-error)
|
||||
'((:unscheduled . 1)
|
||||
(:active . 1))
|
||||
(lambda (k)
|
||||
(if (member k org-done-keywords) 0 1))
|
||||
#'nd/get-iterator-project-status))
|
||||
|
||||
;; project with TODO states could be basically any status
|
||||
((equal kw "TODO")
|
||||
(nd/descend-into-project
|
||||
'(:unscheduled :empty :active)
|
||||
'(:project-error . 0)
|
||||
(lambda (k)
|
||||
(let ((ts (nd/is-scheduled-heading-p)))
|
||||
(cond
|
||||
((not ts) 1)
|
||||
((< nd/iter-future-time (- ts (float-time))) 2)
|
||||
(t 0))))
|
||||
#'nd/get-iterator-project-status))
|
||||
|
||||
(t (error (concat "invalid keyword detected: " kw)))))
|
||||
|
||||
(defun nd/get-iterator-status ()
|
||||
"Get the status of an iterator where allowed statuscodes are in list
|
||||
`nd/get-iter-statuscodes.' where latter codes in the list trump
|
||||
earlier ones."
|
||||
(let ((iter-status (first nd/iter-statuscodes))
|
||||
(subtree-end (save-excursion (org-end-of-subtree t))))
|
||||
(let ((cur-status (first nd/iter-statuscodes))
|
||||
(breaker-status (-last-item nd/iter-statuscodes))
|
||||
(subtree-end (save-excursion (org-end-of-subtree t)))
|
||||
(prev-point (point)))
|
||||
(save-excursion
|
||||
(setq previous-point (point))
|
||||
(outline-next-heading)
|
||||
(while (and (not (eq iter-status :active))
|
||||
(< (point) subtree-end))
|
||||
(let ((keyword (nd/is-atomic-task-p))
|
||||
(while (and (not (eq cur-status breaker-status))
|
||||
(< prev-point (point) subtree-end))
|
||||
(let ((kw (nd/is-todoitem-p))
|
||||
(new-status))
|
||||
(if keyword
|
||||
(progn
|
||||
(setq new-status (if (nd/heading-compare-timestamp
|
||||
(lambda ()
|
||||
(or (nd/is-scheduled-heading-p)
|
||||
(nd/is-deadlined-heading-p)))
|
||||
nd/iter-future-time t)
|
||||
:active
|
||||
:empty))
|
||||
(if (nd/compare-statuscodes > new-status iter-status nd/iter-statuscodes)
|
||||
(setq iter-status new-status)))))
|
||||
(outline-next-heading)))
|
||||
iter-status))
|
||||
(when kw
|
||||
;; test if project of atomic task
|
||||
;; assume that there are no todoitems above this headline
|
||||
;; to make checking easier
|
||||
(setq
|
||||
new-status
|
||||
(if (nd/heading-has-children 'nd/is-todoitem-p)
|
||||
(nd/get-iterator-project-status kw)
|
||||
(let ((ts (or (nd/is-scheduled-heading-p)
|
||||
(nd/is-deadlined-heading-p))))
|
||||
(cond
|
||||
((member kw org-done-keywords) :empty)
|
||||
((not ts) :unscheduled)
|
||||
((< nd/iter-future-time (- ts (float-time))) :active)
|
||||
(t :empty)))))
|
||||
(when (nd/compare-statuscodes > new-status cur-status nd/iter-statuscodes)
|
||||
(setq cur-status new-status))))
|
||||
(setq prev-point (point))
|
||||
(org-forward-heading-same-level 1 t)))
|
||||
cur-status))
|
||||
|
||||
(defun nd/get-periodical-status ()
|
||||
"Get the status of a periodical where allowed statuscodes are in list
|
||||
|
@ -3009,7 +3063,11 @@ These agenda commands are the center of the gtd workflow. Some are slower than d
|
|||
("t"
|
||||
"Task View"
|
||||
(,(nd/agenda-base-task-cmd*
|
||||
act-no-rep-match
|
||||
;; TODO, this can be better optimized if this view is split,
|
||||
;; right now need to include DONE because may have
|
||||
;; done-unclosed
|
||||
(concat actionable "-" periodical "-" habit "-" iterator)
|
||||
;; act-no-rep-match
|
||||
"Tasks"
|
||||
''nd/skip-non-tasks
|
||||
''(:undone-closed :done-unclosed :active :inert)
|
||||
|
@ -3022,7 +3080,7 @@ These agenda commands are the center of the gtd workflow. Some are slower than d
|
|||
'(concat (and nd/agenda-limit-project-toplevel "Toplevel ") "Projects")
|
||||
''nd/skip-non-projects
|
||||
''(:scheduled-project :invalid-todostate :undone-complete :done-incomplete
|
||||
:stuck :waiting :held :active)
|
||||
:stuck :waiting :held :active :inert)
|
||||
''nd/get-project-status t t)))
|
||||
|
||||
("i"
|
||||
|
|