@node Deadlines and scheduling
|
||||
@section Deadlines and scheduling
|
||||
|
||||
A timestamp may be preceded by special keywords to facilitate planning:
|
||||
A timestamp may be preceded by special keywords to facilitate planning. Both
|
||||
the timestamp and the keyword have to be positioned immediatly after the task
|
||||
they refer to.
|
||||
|
||||
@table @var
|
||||
@item DEADLINE
|
||||
|
@ -6302,25 +6304,22 @@ sexp entry matches.
|
|||
@node Inserting deadline/schedule
|
||||
@subsection Inserting deadlines or schedules
|
||||
|
||||
The following commands allow you to quickly insert@footnote{The @samp{SCHEDULED} and
|
||||
@samp{DEADLINE} dates are inserted on the line right below the headline. Don't put
|
||||
any text between this line and the headline.} a deadline or to schedule
|
||||
The following commands allow you to quickly insert a deadline or to schedule
|
||||
an item:
|
||||
|
||||
@table @kbd
|
||||
@c
|
||||
@orgcmd{C-c C-d,org-deadline}
|
||||
Insert @samp{DEADLINE} keyword along with a stamp. The insertion will happen
|
||||
in the line directly following the headline. Any CLOSED timestamp will be
|
||||
removed. When called with a prefix arg, an existing deadline will be removed
|
||||
from the entry. Depending on the variable @code{org-log-redeadline}@footnote{with corresponding
|
||||
@code{#+STARTUP} keywords @code{logredeadline}, @code{lognoteredeadline},
|
||||
and @code{nologredeadline}}, a note will be taken when changing an existing
|
||||
Insert @samp{DEADLINE} keyword along with a stamp. Any CLOSED timestamp will
|
||||
be removed. When called with a prefix arg, an existing deadline will be
|
||||
removed from the entry. Depending on the variable
|
||||
@code{org-log-redeadline}@footnote{with corresponding @code{#+STARTUP}
|
||||
keywords @code{logredeadline}, @code{lognoteredeadline}, and
|
||||
@code{nologredeadline}}, a note will be taken when changing an existing
|
||||
deadline.
|
||||
|
||||
@orgcmd{C-c C-s,org-schedule}
|
||||
Insert @samp{SCHEDULED} keyword along with a stamp. The insertion will
|
||||
happen in the line directly following the headline. Any CLOSED timestamp
|
||||
Insert @samp{SCHEDULED} keyword along with a stamp. Any CLOSED timestamp
|
||||
will be removed. When called with a prefix argument, remove the scheduling
|
||||
date from the entry. Depending on the variable
|
||||
@code{org-log-reschedule}@footnote{with corresponding @code{#+STARTUP}
|
||||
|
|